A pool replaster sounds like a big project, but the sequence is straightforward once you know it. Most of the time goes to preparation, and the plastering itself happens in a single day.
It starts with draining the pool. In Southwest Florida's high water table, this is done carefully and timed so the empty shell isn't exposed for longer than needed. Once it's empty, the crew cleans the surface and inspects it closely for loose or hollow areas.
Next is prep: removing failing plaster, repairing cracks and voids, and preparing the old surface so the new coat bonds. Tile, fittings, and the deck are protected while this happens. This step is the one that decides how long the new finish lasts, so it's never rushed.
Plaster day is fast and focused. The new finish is mixed and applied across the whole pool, then troweled smooth on walls, floor, steps, and benches. The fill starts right after, and from there it's startup care: brushing and balanced water while the new plaster cures.
